Description
After total drying (min. 7 days, temp. 20 ± 2 ° C and HR 55 ± 10%) this product makes it possible to satisfy the high demands of swimming pool paintings or non-potable water tanks.
After total drying (min. 7 days, temp. 20 ± 2 ° C and HR 55 ± 10%) this product makes it possible to satisfy the high demands of swimming pool paintings or non-potable water tanks.
After total drying (min. 7 days, temp. 20 ± 2 ° C and HR 55 ± 10%) this product makes it possible to satisfy the high demands of swimming pool paintings or non-potable water tanks.
Reviews
There are no reviews yet.